南宁桑拿按摩网交流论坛_重庆一品楼品凤楼网站论坛_上海品茶600块左右

Industry information The current position:home > Industry information

Emergency plan for disposal of cement pipe mould

Release time:2019-12-24    This article is read :1466 次

cement pipe mould

Emergency plan for disposal of cement pipe mould

1, cement pipe mold headquarters issued an emergency plan to start the command, and specify the command of the scene, the other groups should quickly rushed to the scene.

2, on-site command received instruction command groups according to the degree of risk, the nature of the event, according to the division of labor, should quickly set up the warning area, at the same time the transfer of hazardous areas and the masses of unrelated persons, their good protection measures.

3, cement pipe mold technical guidance group and emergency rescue team should fulfill their respective responsibilities, quickly into the specific emergency task.

4, cement pipe die after the elimination of danger, carefully check the site, equipment and facilities, to ensure that there is not any danger, danger completely ruled out after the report released by the command command, disarmed, logistical support group dealing with the aftermath, the other groups recovered to normal working state.

Emergency plan for disposal of cement pipe mould
Previous:Septic tank mold what effect on the nature!next:Attention to small details can reduce equipment loss

All rights reserved:Tai'an Renhe Machinery Manufacturing Co., Ltd.     鲁ICP备13025187号-2        公示信息

主站蜘蛛池模板: 玛纳斯县| 梧州市| 古蔺县| 辽阳市| 防城港市| 西峡县| 东乌| 阿尔山市| 开远市| 右玉县| 松江区| 扬中市| 连城县| 江口县| 武山县| 建阳市| 云霄县| 铜山县| 阳春市| 五莲县| 浑源县| 牙克石市| 社旗县| 闸北区| 巴彦淖尔市| 新余市| 南郑县| 青河县| 盐亭县| 长宁县| 邢台市| 全州县| 孟连| 蕲春县| 纳雍县| 灵武市| 漳州市| 肇源县| 洛宁县| 南岸区| 句容市|